The activity entry sheet is personal and allows you to declare the time spent on phases or projects to which you have been assigned.

Activity input by users is used to consolidate project workloads in man-days (MD). All the hours or days entered by the user are automatically consolidated at the level of the resource associated with the user on the project.

This gives an overall view of the project's progress in relation to the target initially set. It also calculates the remaining work and allows you to adjust the estimated if the target needs to be reconsidered.

In concrete terms, the next activity entry will be summed up by week, then by month, and finally integrated into the project in the corresponding period .

In the project, this will be directly consolidated on the period for the resource in " completed " and then in " completed cumulated".

🚦
Prerequisites :
  • The user must be linked to his resource
  • The resource must be allocated to at least one project
  • User must be a project team member

Articles

Access your activity dataAccess your activity dataEnter your activityEnter your activitySubmit, validate and reject activity entriesSubmit, validate and reject activity entriesAdministering Activity EntryAdministering Activity Entry

Frequently asked questions

‣

Why can't I see all my assignments in my timesheet ?

Make sure you are assigned as a resource on the project. Adding a user to the project team is for permissions, not for assignments.

đź’ˇ
When a new period begins, you will find your activity log pre-filled with:
  • the assignments on which you remaining work have remaining work to do,
  • the assignments for which you have already entered activity during the previous month,
  • assignments to active phases (whose start date is on or after today's date).

Once the resource has been assigned, the phase project appears on their timesheet.

If no allocation has been made for the current month, then when the next month begins, the allocation must be re-entered on the timesheet.

Each day, a load corresponding to one day or a specific number of hours is expected (the number of hours per day can be configured).

‣

What do the color codes in my activity report mean?

The timesheet list uses a color-coding system timesheet

  • red: the timesheet the capacity
  • green: the timesheet the capacity
  • blue: the timesheet less than the capacity
  • no color (gray): no timesheet
‣

Why can't I view or modify some of my colleagues' entries?

There are several possible reasons:

  • They appear grayed out. This is due to a setting in the parameter structure parameter with the category relevant resources. parameter structuresparameter structures
  • After a draft text, a lock icon may appear. This means that in the SummarySummary, the entry has been validated. Until the lock is released, it will completed longer be possible to mark the entry as " completed for the resource, regardless of the status .
  • You cannot access their entries because you do not have the necessary permissions.
‣

Should I enter my activity in hours or days?

This setting applies to all users of the platform. The progress bar in the upper-right corner of the page indicates whether the unit is hours (h) or days (d). It also shows the extent of the work completed relative to the number of days in the period and the capacity each resource.

image
🚨
The settings for the timesheet entry/display mode timesheet configured via this box of the Global configurationGlobal configuration If the display is in timesheet hour, in which case the timesheet be filled out in hours, or 1j for a full day. If the resource has a specific number of hours per day, the day will turn green once the full number of hours per day has been entered. If the number of hours per day is set by default, the amount entered is compared to the number of hours per day defined for the platform. With this entry mode, the remaining work in the timesheet converted to hours. The hours entered are converted to days in the project. If the display is in timesheet day, so timesheet to fill out the timesheet by entering 1 for a full day, 0,5 for a half-day, 2h for two hours or any other number based on the number of hours configured. The number of hours per day is set via this fieldFull-time management for one hour, for a full day, or any other number based on the configured number of hours. The number of hours per day is set via Number of hours per day
‣

What happens if my calendar is displayed in EN-US mode? 🇺🇸

Depending on the calendar settings (EN-US), the first day of the week may vary. For example:

  • in week view, when hovering over a week, the day displayed is Sunday,
  • in daytime display, weeks begin on Sunday
  • in week view, only Sunday can be selected as start date and Saturday as end date

To find out more...

Activity entriesActivity entries

Enter my activityEnter my activity