Reallocate the planned

Description

This button is used to allocate a planned load from one resource to other resources. For example, if the planned load is 25, it will not be possible to exceed this number (resource 1 = 15, resource 2 = 10). It is possible to select resources already present on the project or to choose one of the platform's resources. Rights required : UP resource selectionUP resource selection 🚩 This button is available via the contextual menu of a resource line.

Button
Screen for reassigning planned from one resource to another for a given phase
Screen for reassigning planned from one resource to another for a given phase

The planned load of the resource selected at the start must be distributed to other resources: in this case, the initial load was 5 and is now distributed to 2 new resources.

Copy of Field list

Name
Information
Resource selectionResource selection

Choice between : - All resources Allows you to display all the platform's resources in the left-hand selection pane. - Project resources allows you to filter resources and display only those assigned to the project in the left-hand selection pane

X" profile resourceX" profile resource

Allows you to filter resources with the same profile as the selected resource (in addition to the project resources or all resources filter) in the left-hand selection pane.

WordingWording

Several resource labels are displayed: - Resource label with target to be reassigned (resource selected at start) - Labels of resources that are a priori available (selected in the selection pane on the left) - Labels of resources to which we're going to assign the load of the initial resource and label of the initial resource.

ProfileProfile

The profile of resources (to be reassigned, available or assigned) is displayed in this field.

targettarget

The target load of resources (to be reallocated, available or allocated) is displayed in this field.

Non-exhaustive list of error/information messages