This button is used to assign a load target from one resource to other resources. For example, if the load target is 25, it will not be possible to exceed this number (resource 1 = 15, resource 2 = 10). It is possible to select resources already present on the project or to choose one of the platform's resources. Rights required : UP resource selection 🚩 This button is available at contextual menu of a resource line.
The target load of the resource selected at the start must be distributed to other resources: in this case, the initial load was 5 and is now distributed to 2 new resources.
Name | Information |
---|---|
Choice between :
- | |
Allows you to filter resources with the same profile as the selected resource (in addition to the project resources or all resources filter) in the left-hand selection pane. | |
Several resource labels are displayed: - Resource label with target to be reassigned (resource selected at start) - Labels of a priori available resources (selected in the selection pane on the left) - Labels of resources to which we're going to assign the load of the initial resource, and the initial resource's label. | |
The profile of resources (to be reassigned, available or assigned) is displayed in this field. | |
The load target of resources (to be reallocated, available or allocated) is displayed in this field. |