- Activer la saisie du prévisionnel
- Modifier la structure de mesure ressource concernée
- Sur le plan capacitaire
forecast total, like remaining work, is one of the representations that make up scheduling resources.
This is a "general" scheduling , automatically calculated on a monthly basis. It is saved by initializing period each month.
The forecast total works with a forecast rate (q).
q = (sum of distributed forecasts for the projects/phases to which the resource is allocated) / (sum of distributed forecasts for the projects/phases to which the resource is allocated) capacity
The forecast total distributed is a representation for resources, which enables resource allocation to be managed. It's a "general" scheduling at the monthly level.
Unlike remaining work, this representation is not decremented over time.
The forecast total cumulative remaining is a representation for resources, which is used to control resource allocation. It corresponds to forecast total for the last month after the initialization of period. This month must be included in the period displayed on plan .
forecast total cumulative (M) = ∑(distributed forecasts M, M+1, M+2, M+3...)
The notion of forecast rate is displayed via a color code and the notion of representation is displayed according to a font style on the cells for a period (day, week, month). 👇
Cell format | Meaning and impact | Files |
---|---|---|
Perfect load (sum forecast total = capacity) q = 1 | ||
Charge presque parfaite (somme prévisionnel < capacité) 0.66 < q < 1 | ||
Disponible (somme prévisionnel < capacité) q < 0.66 | ||
Très disponible (somme prévisionnel < capacité) 0.33 < q < 0.66 | ||
Overload (sum forecast total > capacity) q > 1 | ||
When no forecast total has been entered | ||
When the dates do not correspond to the duration of the phase (before the start of the phase or after the end of the phase) or when the days are not worked for the resource |
forecast total is entered at the month level.
On hovering over the cells, the forecast resource rate for the month is shown on plan capacitaire, as well as completed, capacity and remaining work ressource réparti.
Activer la saisie du prévisionnel
Modifier la structure de mesure ressource concernée
- Cliquer sur le menu principal, puis sur l’écran Administration.
- Dans la section
Paramétrages des mesures
>Paramétrages des ressources
click on the map Structures de mesure. - Go to the relevant parameter structure.
- Ajouter les représentations
forecast total
andforecast total cumulative remaining
. Save
.
Sur le plan capacitaire
- Accéder au plan capacitaire (Menu principal > Resource management > Plan capacity)
- Sélectionner le type d'affichage
Prévisionnel ressources
. - Enter forecast total for the desired projects and resources, and compare it with remaining work .