Description
This button is used to assign a load target from one resource to other resources. For example, if the load target is 25, it will not be possible to exceed this number (resource 1 = 15, resource 2 = 10). It is possible to select resources already present on the project or to choose one of the platform's resources. Rights required : UP resource selection, Enter the target of a resource
The target load of the resource selected at the start must be distributed to other resources: in this case it was 1 at the start and is distributed to 2 new resources (0.5 x2) so that the selected resource is unloaded.
Field name | Information |
Choice between :
- All resources Allows you to display all the platform's resources in the left-hand selection pane.
- Project resources allows you to filter resources and display only those assigned to the project in the left-hand selection pane | |
Allows you to filter resources with the same profile as the selected resource (in addition to the project resources or all resources filter) in the left-hand selection pane. | |
Several resource labels are displayed:
- Resource label with target to be reassigned (resource selected at start)
- Labels of a priori available resources (selected in the selection pane on the left)
- Labels of resources to which we're going to assign the load of the initial resource, and the initial resource's label. | |
The profile of resources (to be reassigned, available or assigned) is displayed in this field. | |
The load target of resources (to be reallocated, available or allocated) is displayed in this field. |