Description
This button allows the manager or resource manager to validate an activity entry sheet at the status Submitted
.
🚨 This action is possible for resource activity entry sheets attached to the same structure level as manager.
A window appears: an e-mail must be sent to the resource so that changes can be made to the activity entry sheet.
It is possible to check/uncheck notes entered on days and phases to help the resource know which entries need to be modified.
The status on the timesheet sheet (top left) changes from Submitted
à Refused
.
🚩If the resource modifies its timesheet sheet again, it will go back to the status Draft
.
Rights required : Validate/refuse resource entry